Baker River | |
Baker River valley from the northeast
|
|
Country | United States |
---|---|
State | Washington |
County | Skagit, Whatcom |
Source | Cascade Range |
- location | Whatcom Peak, Whatcom County |
- elevation | 5,800 ft (1,768 m) |
- coordinates | [1] |
Mouth | Skagit River |
- location | Concrete, Skagit County |
- elevation | 820 ft (250 m) [1] |
- coordinates | [1] |
Length | 30 mi (48 km) [1] |
Basin | 297 sq mi (769 km2) [2] |
Discharge | for river mile 0.7 near Concrete, WA |
- average | 2,649 cu ft/s (75 m3/s) [2] |
- max | 36,600 cu ft/s (1,036.4 m3/s) |
- min | 30 cu ft/s (0.8 m3/s) |
Map of the Baker River watershed
|
|
Location of the mouth of Baker River in Washington
|
The Baker River is an approximately 30-mile (48 km),[1] southward-flowing tributary of the Skagit River in northwestern Washington in the United States. It drains an area of the high North Cascades in the watershed of Puget Sound north of Seattle, and east of Mount Baker. With a watershed of approximately 270 square miles (700 km2) in a broad and deep valley partially inside North Cascades National Park, it is the last major tributary of the Skagit before the larger river reaches its mouth on Skagit Bay. The river flows through Concrete, Washington near its mouth and has two hydroelectric dams owned by Puget Sound Energy.
Contents |
The Baker River rises in the Cascade Range near Whatcom Peak, in the northern section of North Cascades National Park. It flows south, starting in the Baker River Valley north-east of Mount Shuksan. The river flows generally southwest through a steep glacial valley, receiving several short glacial-fed tributaries from surrounding mountains. Many of these tributaries harbor tall, but never officially measured waterfalls. Most of the southern half of the river is impounded in artificial lakes, both part of the Baker River Hydroelectric Project. The first reservoir is 9-mile (14 km)-long Baker Lake, impounded by Upper Baker Dam. (The lake was formerly a natural lake, until its level was raised by the 312-foot (95 m)-high dam.) Lake Shannon, impounded by Lower Baker Dam, begins immediately below Baker Lake and stretches about 7.5 miles (12.1 km) downstream. Below Lower Baker Dam the Baker River flows unimpeded (except for a small weir at a fish passage station) for about a mile before emptying into the Skagit River.
Most of Baker Lake is in the Mount Baker-Snoqualmie National Forest. Upper Baker Dam is located in Whatcom County and Lower Baker Dam is located in Skagit County above the town of Concrete. Both dams are owned by Puget Sound Energy.[3]
Baker River sockeye are the only known sustaining population of Sockeye salmon in the Skagit River drainage basin. The Washington Department of Fish and Wildlife has determined the Baker River sockeye to be genetically distinct from other sockeye salmon. As of 1992 the condition of the population was listed as "critical". In 1985 only 92 adults were found to return to the river.[4] Since the 1990s, however, the population has recovered somewhat, in part due to improvements in the smolt trapping and transportation system. A high of 20,235 fish were counted in 2003.[5]
Before Lower Baker Dam was built in 1925 the fish had free access to the river and natural (pre-dammed) Baker Lake. The annual sockeye run at that time was estimated to be approximately 20,000 fish. Artificial enhancement began in 1896 when the State of Washington constructed a hatchery on Baker Lake. This was the first establishment for the hatching of sockeye salmon.[6] The hatchery closed in 1933. The construction of Upper Baker Dam in 1959 inundated the natural Baker Lake and surrounding valley, including the spawning grounds of the Baker River sockeye. Artificial spawning beds were constructed at the upper end of the new Baker Lake. An additional spawning beach was built on Sulfur Creek in 1990. All returning sockeye are trapped below Lower Baker Dam and transported to the artificial spawning beaches.[5]
The Baker River also supports other fish such as Coho salmon.[4]
Tributaries of the Baker are listed proceeding upstream. L and R denote left and right bank, respectively: